Design & DFM
Does the structure suit the intended process?
A working prototype is a starting point, not a production release.
For teams with an existing prototype or design that needs a practical route to stable manufacturing.
A production release should be based on agreed evidence. Tooling expenditure and a good-looking sample do not by themselves demonstrate a stable manufacturing process.
The prototype may have answered its intended question. Record which materials, processes and conditions it represented.
Manufacturability, supply, assembly, cost and quality need to work together under production conditions.
Does the structure suit the intended process?
Are specifications suitable for repeat supply?
Can parts fit and assemble consistently?
What tools or fixtures are needed, and how will they be verified?
Is manufacturing information complete and consistent?
Do capability and quality requirements align?
Which questions need a representative trial?
What evidence supports the next release decision?
Areas to evaluate according to the product. They are not a mandatory service package or an assumption that every prototype needs redesign.
Review the prototype revision, how it was made and what was tested. Identify production materials, interfaces, tolerances and conditions that the prototype has not demonstrated.
Prioritize DFM and engineering changes by risk. Agree which dimensions, materials and assembly decisions must be fixed before tooling commitments, and which uncertainties need another targeted trial.
Define the production-representative build, inspection and test criteria. Review first parts, assembly sequence, recurring defects and process variation. A pilot should produce evidence for a release decision, not merely a batch of samples.
Close high-priority actions, record the approved revision and reference samples, and assign ongoing inspection and change control. Where criteria are not met, document the remaining work before increasing volume.